This is not my first rodeo, but first thought of cycling. I need to make sure my timing is ok.
I ended P2 on 2/3/2015. Wanting to start on 2/22/2015 with 1 day loading, then run a 20 day P2 round ending on 3/15/2015, back to P3 on 3/16. Thoughts? Can I get away with this, or is it too close together?
Edit: By the way (after reading the next comments) I have done a full P2,3,4 round, plus another P2 round.
I ended P2 on 2/3/2015. Wanting to start on 2/22/2015 with 1 day loading, then run a 20 day P2 round ending on 3/15/2015, back to P3 on 3/16. Thoughts? Can I get away with this, or is it too close together?
Edit: By the way (after reading the next comments) I have done a full P2,3,4 round, plus another P2 round.